PETITE FORESTIER
SERVICE DEPOT

CASE STUDIES

This project was the design and build of a new service depot for Petit Forestier in Bicester.  The superstructure is a steel frame with cladding rails and roof purlins.  Ground bearing concrete to take 2-tonne loading was put in place along with reinforced concrete inspection & oil retention pits.

  • Tarmac to car and large vehicle parking bays, service yard and entrance road
  • Brushed concrete finish to diesel storage and wash down areas
  • Perimeter fencing – Weldmesh panel fencing RAL 9010 with sliding entrance gate
  • Landscaping –including grass, trees and shrubs
  • Diesel storage works below ground
  • Washdown area with water, power supplies and drainage
  • Petrol interceptors

AT A GLANCE

Value

975K

Client

PETIT FORESTIER

Contract – JCT

Petit Forestier
Petit Forestier