This project was to provide a multi discipline reconfigurable water course facility to provide year-round training for both white water sports enthusiasts and the local Fire & Rescue Service.
- The patented pre-cast concrete base units complete with uni-strut rail installed to +/-2mm tolerances allow vehicles to be fixed down for fire and rescue training as well as the Rapidbloc system to create a canoe slalom
- 3 x 7cumex pumps then push 21,000 litres of water per second down the course to recreate rapids
- The project was completed on time and within budget
AT A GLANCE
Value
£1M
Client
SCOTTISH CANALS
Contract – JCT
![Pinkston – Rapid Waters Pinkston - Rapid Waters](https://meldrumcs.com/wp-content/uploads/2021/01/Rapid-Waters-1.jpg)
![Pinkston – Rapid Waters Pinkston - Rapid Waters](https://meldrumcs.com/wp-content/uploads/2021/01/Rapid-Waters-4.jpg)
![Pinkston – Rapid Waters Pinkston - Rapid Waters](https://meldrumcs.com/wp-content/uploads/2021/01/Rapid-Waters-7.jpg)
![Civil Engineering](https://meldrumcs.com/wp-content/uploads/2020/11/Meldrum_Civils_IconLine.png)