FORMICA
FACTORY EXTENSION

CASE STUDIES

This project was an extension to the West Factory Unit and associated access road.

  • Erection of steel framed building tied in to existing West Factory with built up cladding system
  • 2800m² internal floor installed to FM2 specification.
  • Complex NWL drainage diversion
  • 20-week construction delivered on programme
  • Working in live factory environment
  • Contract delivered in 2 phases to suit clients fit out requirements
  • Attenuation tank and penstock
  • 2300m² (460m³) concrete slab poured in one day to minimise construction joints
  • 8m deep NWL drainage diversion
  • Timely demolition of existing factory wall, with care taken not to disrupt production or contamination of Formica equipment

AT A GLANCE

Value

£1.6M

Client

FORMICA

Contract – JCT

Formica
Formica